About the 15th of May the keel of the new vessel lay along the dockyard, and soon the stem and stern-post, mortised at each of its extremities, rose almost perpendicularly. The keel, of good oak, measured 110 feet in length, this allowing a width of five-and-twenty feet to the midship beam. But this was all the carpenters could do before the arrival of the frosts and bad weather. During the following week they fixed the first of the stern timbers, but were then obliged to suspend work. During the last days of the month the weather was extremely bad. The wind blew from the east, sometimes with the violence of a tempest. The engineer was somewhat uneasy on account of the dockyard shed—which besides, he could not have established in any other place near to Granite House—for the islet only im